Approved V10 base / Proposed coordination / 6 September 2026

A home that senses,
plays and listens.

Practical locations for the interior designer and installers. Keep the sensors exposed, wire the ceiling speakers now, and provide accessible points for your own conversational AI.

08trial sensors
05 + 01ceiling + tabletop
03voice provisions

Proposed positions for on-site verification. Drawing-top is geographic west; drawing-right is north. Symbols are illustrative, not measured installation points. The approved renovation plan is unchanged.

01 / Presence sensors

Eight FP2 trial points on the approved plan, with kitchen S6 at the entrance end aiming plan-up along the aisle toward the yard. Arrows show aim; dashed blue line is an unverified entrance sightline.
Tap the plan to open and zoom. Green = exposed FP2; orange = bathroom trial requiring wet-area detailing. Arrows show aim only. Blue dashed ray / ? = entrance sightline to test. S6 faces plan-up toward the yard. Shelter excluded.
  • S1
    Master bedroom

    Plan-top-right corner, facing diagonally toward the bed. Test the bed and doorway; avoid curtain interference.

  • S2
    Spare bedroom

    Plan-bottom-left corner, facing into the room. Keep clear of curtains and test with the door closed.

  • S3
    Master bathroom / Bath 1

    Plan-top-left shower region toward the room. This wet-area candidate needs supplier and installer review; test across the shower glass.

  • S4
    Common bathroom / Bath 2

    Plan-bottom-right shower region toward the interior. Keep away from the shower jet; final mounting depends on wet-area suitability.

  • S5
    Living / dining + entrance

    Plan-top-left beneath the spare room, aiming across dining. The shelter corner may hide the threshold; the entrance assignment is provisional.

  • S6
    Kitchen / yard · entrance end

    At the kitchen entrance end, on an exposed wall or suitable bracket with a clear view along the aisle. Aim plan-up toward the yard; this is a direction on the drawing, not a tilt toward the ceiling. Confirm the support, mounting height and coverage on site.

  • S7
    Study

    Plan-bottom-left toward the room and desk. Test around the sofa, bookshelf and sliding glass.

  • S8
    Bedroom corridor

    Master end, on the corridor-side wall or bracket, aiming plan-down. Keep clear of the revised master door swing.

Exposed sensor, concealed cable.

Use wall / suitable bracket mounting for multi-zone presence. Conceal wiring through available coordinated routes; keep the radar face exposed. No kitchen renovation or new false ceiling is planned: S6’s power/cable route also remains to be confirmed. Ceiling fall-detection mode is not a substitute for this arrangement. Select the height by room trial with the logo level. The old sketch’s 1.6–1.8 m is not an approved mounting rule.

Provide continuous USB power, an accessible supply and serviceable connections. Check 2.4 GHz Wi-Fi at every location.

Bathroom detailing and the trial checklist

Aqara identifies the FP2 as IPX5 and says the adapter and wall outlet must be waterproof for humid use. This does not certify the complete exposed USB connection or a shower-zone installation. Have the supplier and installer detail the actual sensor, connector, supply location and protection; avoid direct spray and keep the face exposed. Reposition S3 / S4 if suitability cannot be established.

Test bedroom and entrance doors open / closed; study sliding glass open / closed; shower glass open / closed; a shower occupant and running water without an occupant. Check bed, desk, WC, basin, corridor and entrance occupancy, plus curtains, AC and fans. Configure room edges and interference areas after the trial.

Official guidance checked 6 Sep 2026: FP2 productUser manualInstallation FAQ

For the ID and installers

Resolve together before the ceiling closes.

01 / Survey + trial

Confirm usable ceiling space and services. Trial all eight sensors, including S6 from the kitchen entrance toward the yard, bathroom glass and the entrance blind spot. Prototype study voice with the room in use.

02 / Coordinate the equipment bay

Add amplifier rack provision alongside the UniFi fibre gateway, Raspberry Pi and possible Mac mini. Confirm DB access, outlets, equipment clearances, shelf loading, cable management and ventilation from actual heat loads.

03 / Agree + record

Select products and furniture, mark measured points and cable routes with the ID, then label, photograph and test every run before closure. The entrance vent design does not prove sufficient cooling.

Download the designer handout